Studio Salvi Weber
Studio Salvi Weber
BCK Visualisierung Fassade 1
BCK Modell 2
BCK Modell 3
BCK OG1 1 200 BCK Modell 4
BCK Modell 1
BCK Modell 5
BCK Lageplan
BCK Schnitt
BCK EG1
BCK Visualisierung Fassade 1 BCK Modell 2 BCK Modell 3 BCK OG1 1 200 BCK Modell 4 BCK Modell 1 BCK Modell 5 BCK Lageplan BCK Schnitt BCK EG1

The competition brief comprises a new headquarters for the Bodner Group as part of the Bodner Campus in Kufstein. The new building is intended to act as a competence centre for the construction industry and to form a new gateway to the city at its urban interface.
 

The design develops the campus as four building volumes arranged around a generous central square, allowing the site to grow flexibly in several phases. Within the headquarters, a centrally placed stair structure forms the spatial core: it connects the levels, serves as a forum for informal encounters and events, and also becomes part of the escape route concept. Along the façade, a continuous working zone combines open office areas, enclosed retreat rooms, tea kitchens and communication islands.

Project details

Project type: One-Stage Invited Competition
Competition Result: 3rd Prize
Client: Ing. Hans Bodner Bau Ges. m.b.H. & Co. KG
Location: 6330 Kufstein
Competition: 2020
BGF: 6.832 m²
Team: Maximilian Dietz, Anja Gazivoda, Patrick Gläßner, Tristan Hunt, Veronika Stoklaskova, Anna Zita Leutgeb

Collaborations

Structural engineering: Gmeinerl Haferl
Building Services Engineering: CES clean energy solutions
Fire safety: IMS Brandrat